Sök:

Sökresultat:

4299 Uppsatser om ABB Building Systems AB - Sida 1 av 287


Distribuerade fastighetsautomationssystem : - En implementation av kommunikationsprotokollet BACnet

Building Automation Systems in commercial buildings are often designed and installed by different contractors, using equipment and components from different manufacturers. The lack of an accepted communication standard has resulted in a few different standards. Many manufacturers of building automation systems only support one, a few or none of these standards, while developing proprietary system solutions. Regin, who develop such equipment, are planning to adopt an open communication protocol specially designed for building automation - BACnet. As a step in that direction this thesis was announced with the purpose to investigate the possibility to implement BACnet in one of their products and to gain more knowledge of the BACnet protocol.

Dokumenthanteringssystem inom byggbranschen

One of the aims of this report has been to make an inventory of the building trade market to see which document handling systems that are available. The secondary aim was to document the users´ demands on the systems and other demands such as quality assurance. After this, the document handling systems Byggnet and Lotus Notes, which are rather complex systems, have been analysed. Finally a recommendation has been made. In the inventory of the marketthe internet has been used because it is there the latest information can be found.

Uppnå användaracceptans genom interaktionsdesign : med CRM-system som applikationsomåde

The purpose of the study was to investigate the use and losses of energy in an existing older building. Another purpose was also to look through various options for heating systems with renewable energy in the building. The aim was to reduce the use and losses of energy. The first step was to study the related electricity bills of the building and also perform measurements and calculations of the building envelope and ventilation. The next step was to find out the possible actions for energy saving by performing measurements and calculations.

Green Building : Ett företags energieffektiviseringsarbete i ett byggprojekt samt de krav som ställs för att få byggnaden Green Building klassad.

The examination has been performed at Bjerking AB, which is an architectural and engineering company. Bjerking AB has the ambition to be a member of Green Building.The Green Building program developed in year 2005 by The European Commission, the program is an environmental system with the aim to improving energy efficiency within the sectors of non-residential buildings. The minimum requirements to participate the program are following: in new-built buildings the calculated energy consumption must be 25 % lower than the requirements in the BBR (Building regulations) and in refurbishment the reduction must be 25 % lower than before the optimization.The aim of this study has been to examine and review the company Bjerking AB's energy efficiency work in the project of building the school/kindergarten S:ta Maria Alsike, where the goal is to get this building Green Building classed. A description of requirements to become a member of the Green Building has also accomplished in the thesis.The methods performed in this study are literature review, searches on the Internet, studies on the project database for facts/values, calculation of energy consumption and interviews of members of the Green Building. The following issues have been dealt with in the report;-          Did the building in the project manage the requirement to achieve an   energy consumption that is 25% lower than the requirements in BBR?-          What technical measures/system was selected in the building?-          What kind of cooperation was the project based on?-          What is required for consultancy companies and real estate owners to become members of the Green Building?The study of the project and calculation of estimated energy consumption in the building, give the result 47 kWh/m2, year.

Koalitionsbildning och Fragmentering. En studie av koalitionsbildning i kommuner med fragmenterade partisystem

During the last decades the Swedish local party systems have gone through some considerable changes. The number of parties present in local party systems have increased and in some cases even doubled. This makes coalition building between parties complex and parties will be forced to rethink their coalition strategies and adjust to the new circumstances. Theoretically, coalition building has often been considered and applied to national data and there have been just a few attempts to develop and theoretically explain coalitions on a local level. Thus the aim of this paper is to use different theoretical approaches to local data to test the significance of traditional coalition theories.

Utvecklingsanalys av installationssystems montering vid industriellt träbyggande : Värme, vatten, ventilation, el och avlopp

The industrialized timber housing process is capable nowadays to build multi-storeyhouses since fairly new changes in the Swedish regulations where made after theadmission of the European Union in 1994.The industrialized process moves parts of the construction process into a highlyeffective factory where 3D-volumes of the building are prefabricated beforetransportation to the building site for assemble.The assembly process is relatively effective compared to the completion of thebuilding service system and this is therefore the main focus in this thesis. This thesisattends problems with completion of the building service system, and thereforedemarcates from other aspects, such as technical and economic aspects, of thebuilding service system.The degree of completion of the flats differs from completion of the connectivepassages, for example hallways, in a way that suggests a need for further investigation.This thesis includes analysis of the possibilities to increase the prefabricatedconnective passages, to the extent of containing building service systems.An increase of the prefabrication of the building service system has a greatdevelopment potential, even though some restraining factors need to be solvedbefore implementation.This thesis was made in collaboration with two of Sweden?s leading companies on themarket of multi-storey industrialized timber housing, Moelven ByggModul AB andLindbäcks Bygg AB..

En byggnads energibehov : En studie om energieffektivisering av en befintlig byggnad i södra Sverige

The purpose of the study was to investigate the use and losses of energy in an existing older building. Another purpose was also to look through various options for heating systems with renewable energy in the building. The aim was to reduce the use and losses of energy. The first step was to study the related electricity bills of the building and also perform measurements and calculations of the building envelope and ventilation. The next step was to find out the possible actions for energy saving by performing measurements and calculations.

Granskning av Solibri Model Checker - En Svenskanpassning : Ja?mfo?relse av tva? egenkontrollsystem

The building industry are currently going through a huge alteration. The introduction of BIM (Building Information Modeling). Which also implements a lot of new ways of solving problems that building modeling can cause. This report is written for Uppsala University in cooperation with Temagruppen in Uppsala. However, it contains a comparison between two different systems that checks building models.

Energieffektivisering i flerbostadshus : Undersökning av lönsamheten med energieffektivare ventilation

This thesis is based on a case study for the real estate manager Mimer in Västerås. Mimer provides a great deal of this city?s rental apartments. Many of their buildings have ventilation systems with a type of heat-recovery called ?heatpipe?.

Glastaket : ett bärande klimatskal

This candidate.?s work includes designing of a house with it.?s structural components andinstallations. The house had to be actual with Building Regulations (Boverkets Byggregler).Beside designing of all the crucial systems necessary for completing of claimed regulations evenan optional topic within building engineering had to be chosen.The task included designing of heating, ventilation, sanitation and electricity systems. Structuralengineering models has been made in compliance with Eurocodes. Materials for facades, floorsand roof were chosen and evaluated.As recessed portion of the work, evaluating of possibilities in designing of a glass roof waschosen.

LEED i Sverige och i byggprojektet Borgarfjord 3.

This thesis provides a good introduction to the American environmental certification system LEED, Leadership in Energy and Environmental Design, and trough compar-isons between Sweden and the United States an explanation to the systems design is given. The work is closely linked to a LEED Core & Shell project in Stockholm, Swe-den, where the goal is to reach the second highest rating in LEED - Gold.This thesis gives a broad description of the LEED system and a more profound study of the energy sector, Energy and Atmosphere. Here, for example, an analysis has been made of how the energy consumption of an imaginary building designed according to the requirements of the BBR (Swedish building code) performs in comparison to the Baseline building in LEED.The existing model of Borgarfjord 3, which served as a case study in this work, has al-so been modified to investigate the energy savings that could have been achieved by adding extra insulation to the building. A description of the problems, regarding how the Swedish district heating system (DES) is treated in LEED, is given as well as the suggested modifications. This is an issue that will be pursued during the process of shaping a new, international, version of LEED due to be launched 2012..

Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad

The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the calculations began.

Utvärdering av VAV i nybyggt kontorshus

VAV (Variable Air Volume) system has been studied in a newly constructed office-building. The goal for the study has been to evaluate how the ventilations system work in practice, if adjustments can be made to achieve an more energy efficient system and to evaluate if other alternative ventilation systems is to be preferred in the further.The degree project has been executed at Helenius Engineering Firm who is working with the environment, media systems, HVAC and energy in buildings. The building that has been studied is owned and operated by Akademiska hus.Literature studies, visits at site, inventory, review of system documentation, energy analyses, interviews, key figures, LCC, sand energy- and indoor climate simulations has been made to study the building. Where appropriate some tools from Six Sigma have also been used.How to achieve an energy efficient system and a pleasant indoor climate is studied with human health and well-being as base for the indoor climate requirements. Technical support systems such as ventilation systems have to be designed so that an acceptable indoor climate can be achieved.

OneCore

The Swedish building and property management sector are responsible for about 30 % of the total energy use. In order to take environmental consideration, different environmental assessment tools and standards are used. Miljo?byggnad, Svanen, FEBY12 and PHI are some of these. There has been increased interest to certify buildings and therefore it is of interest to evaluate the assessment of the energy field to see if relevant energy aspects are assessed.

1 Nästa sida ->